
Gi Pipe 1.5 inch Galvanized Steel Pipe Scaffold Tube Building Material St37 Welded Low Carbon
OD | 48.3mm |
Length | Less Than 12m |
Wall Thickness | 2.2-3.75mm |
Steel material | STK500,JISG3444-2006 |
Ends | 1) Plain |
2) Beveled | |
3)Thread with Coupling or cap | |
4)Bending | |
End protector | 1) Plastic pipe cap |
2) Iron protector | |
Surface Treatment | 1) Bared |
2) Black Painted or other colors painted(varnish coating) | |
3) Galvanized | |
4) With Oiled | |
Inspection | With Hydraulic Testing, Eddy Current , Infrared Test |
Standard | STK500,JISG3444-2006 |
Technique | Electronic Resistance Welded (ERW ) |
Electronic Fusion Welded (EFW) | |
Double Submerged Arc Welded (DSAW) | |
Trade terms | |
Packing Term | 1) In bundle with steel strips; |
2) First packing by plastic bag then strips | |
3) In bulk | |
4)Client' requirements | |
Delivery Term | 1) Container: 25 tons/container for pipe with usual outer diameter. |
For 20' container the max length is 5.85m; | |
For 40" container the max length is 11.8m. | |
2) Bulk carrier: It is no requirements to the length of the pipe. | |
But its booking space time is long. |
BS EN39:2001 | |||||
Outer Diameter | Wall Thickness | Weight | |||
mm | Tolerance | mm | Tolerance max | K.G / meter | Tolerance max |
48.3mm 1 1/2" | ±0.5mm | 3.2 | -10% | 3.6 | -7.5% |
4.0 | 4.0 |
Scaffold Tubes Building Material St37 Galvanized Steel Pipe
Commodity | hot dipped and pre-galvanized steel pipe |
OD | 10-600mm(round) |
thickness | 1.2-30mm |
length | 3-12m or as per customers' requirements |
material | Q195-Grade B, SS330, SPC, S185 Q215-Grade C,CS Type B, SS330, SPHC Q235---Grade D, SS400, S235JR, S235JO, S235J2 Q345---SS500, ST52 |
Standard | GB/T13793-1992,GB/T14291-2006, GB/T3091-1993,GB/T3092-1993,GB3640-88 BS1387/1985,ASTM A53/A36,EN39/EN10219,API 5L, GB/T9711.1-99 etc |
zinc coating | pre galvanized steel pipe: 60-150g/m2 hot dipped galvanized steel pipe:200-400g/m2 |
application | Widely used in Structure, Accessorize,Construction, Fluid transportation,machinery parts,the stress parts of the automobile tractor parts and so on |
Package | 1) Big OD: in bulk 2) Small OD: packed by steel strips 3) Plastic bags 4) According to customer's requirement |
Delivery | Normally 7-20 days after get deposits or according to quantity |
Certification | ISO 9001-2008 BV TUV |
advantage | 1. reasonable price with excellent quality 2, abundant stock and prompt delivery 3, rich supply and export experience, sincere service |
<1> Owning professional exporting&sales team for years, we could supply you lots kinds of steel materials with the best quality,price and service.
<2> Both large quantity order and small order are available for us, as well as the customized order.
<3> Third Party Inspection is accepted as customer's request.
1. How long is your delivery time?
Normally, it's 15days after depoist or L/C received, but it will depend on the production schedule of mills(it can be finished within a week if coincidentally)
2. What kinds of payment terms we can use?
T/T or L/C at sight
3. How about your MOQ?
Generally, MOQ is a container(about 20MT) for the customized products, first time cooperation, trial order is acceptable
any question about galvanized steel pipe, welcome to contact with us, then more detailed information will be provided:
Guangzhou Jet Scaffold & Formwork System Co., Ltd.
Guangzhou Jet scaffolding&formwork system Co.,Ltd was established in 2012 in Guangzhou,China.
Our company is an integrated and professional building materials supplier,specialized in the fields of scaffolding and formwork exporting from China.We are committed to become a one-stop service provider of scaffolding construction materials,dedicated to safety,sincerity,research and development.
Our factory covers an area of 15000 square meter and its daily output is more than 100tons. Dedicated to strict quality control and thoughtful customer service, our experienced staff members are always available to discuss your requirements and ensure full customer satisfaction.
Our factory produces all kinds of scaffolding,such as ringlock system,frame system,steel plank,adjustable steel props,cuplock scaffolding,scaffolding pipe,formwork system, adjustable shoring props, steel pipes , adjustable U head,U jack,base construction machines and other scaffolding with high quality for commercial and industrial construction industries.
We have provided best quality products,efficient working system,inspection,shipment,and engineering assistance to customers for more than 10years .As a reward,we won customer recognition and established long term business relations with customers from more than 95 countries,such as America,Australia,Europe,the Middle east and so on.
We also do a good job in OEM and ODM orders of scaffolding. Whether selecting a current product from our catalog or seeking assistance for your application, you can contact us about your sourcing requirements.
Any questions about our products, welcome to contact us. Once you do that , your business will be boundless.We can provide you with a complete engineering solution.